Firstly, the connection method of seamless steel pipes:
1. Compression type: Insert the pipeline into the end of the steel pipe fitting and tighten it with a nut. The force of the screw presses the sleeve onto the end of the seamless steel pipe through the sealing ring, achieving sealing and completing the pipeline connection.
2. Welding type: The pipe end is beveled and then manually or automatically welded with a circumferential seam.
3. Flange type: Weld the flange ring onto the pipeline and tighten it with quick clamps or bolts. The sealing gasket between the flanges provides sealing and completes the pipeline connection.
4. Crimp type: Insert the pipe into the fitting and use a specialized installation tool to press the seamless steel pipe wall into a hexagonal shape. The internal sealing ring also deforms into a hexagon.
5. Cone thread type: Weld the external thread ring to the pipeline, seal the internal thread fittings with the cone thread connection, and complete the pipeline connection.
Secondly, the detailed processing flow of seamless steel pipes
The production process of seamless steel pipes can be divided into cold drawing and hot rolling. The production process of cold-rolled seamless steel pipes is generally more complex than that of hot-rolled pipes. The pipe blank is first subjected to three roll continuous rolling, and then undergoes sizing inspection. If no cracks are found on the surface, cut the round tube into a billet with a length of about one meter.
2. Then the pipeline enters the annealing process. The annealing process involves acid washing with an acidic liquid. During the pickling process, it is important to check whether there are excessive bubbles on the surface of the seamless steel pipe. Excessive bubbling indicates that the quality of the seamless steel pipe does not meet the corresponding standards.
3. Hot rolled seamless steel pipes are generally delivered after heat treatment in the hot-rolled state. After quality inspection, hot-rolled seamless steel pipes are strictly manually selected by staff. After quality inspection, apply oil to the surface and conduct multiple cold drawing tests. Perform perforation test after hot rolling. If the perforation diameter is too large, straightening and correction are required.
4. The outer diameter of hot-rolled seamless steel pipes is generally greater than 32mm and the wall thickness is 2.5-200mm. The outer diameter of cold-rolled seamless steel pipes can be as small as 6mm and the wall thickness can be as small as 0.25mm. The outer diameter of thin-walled pipes can be as small as 5mm and the wall thickness is less than 0.25mm. Cold rolled pipes have higher dimensional accuracy than hot-rolled pipes.
5. Commonly used seamless steel pipes are made of high-quality carbon structural steel (such as 10, 20, 30, 35, 45), low-alloy structural steel (such as 16Mn, 5MnV), or alloy structural steel (such as 40Cr, 30CrMnSi, 45Mn2, 40MnB), etc., through hot rolling or cold rolling processes. Seamless steel pipes made of low-carbon steel such as 10 and 20 are mainly used for fluid transportation pipelines.
6. There are three types of seamless steel pipe threaded connections: cylindrical internal thread and cylindrical external thread matching, cylindrical internal thread and conical external thread matching, and conical internal thread and conical external thread matching. The latter two connection methods are more tightly connected and have a wider range of applications.
(1) Flange connection. Flange connections are generally used for connecting pipes of the same material, such as copper pipes, lead pipes, and plastic pipes. According to the different flange materials, different connection methods are used. The flange must be flat, without cracks or wrinkles.
(2) Threaded flange connection. A flange with internal threads is connected to a steel pipe with external threads. This type of flange is mostly made of cast iron and can be used for low-pressure pipeline connections.
(3) Welding flange connection. The flange and steel pipe are connected by welding. This flange connection method is widely used. The welding method is as follows: select a pair of flanges and install them on two pipe ends. If the equipment already has flanges, choose flanges of the same specifications to install on the pipeline. Firstly, perform small area spot welding to correct verticality, and finally firmly weld the flange to the pipeline.