B. Using a manual threaded plate for threading, first release the fixed trigger, return the threaded plate to zero, install the mold according to the serial number, align the plate with the required proportion, tighten the fixed trigger, and then place the pipeline into the pressure clamp, leaving an appropriate length for clamping. Gently insert the threaded plate into the pipeline to make it moderately tight. Then use both hands to push the threaded plate apart, put on 2-3 buttons, and stand on the side to pull the threaded plate, Power should be. When setting up threads, gently release the trigger, turn on the machine and retract the board, while maintaining the thread's taper.
3. Assembly of pipeline fittings: Assemble threaded pipeline fittings based on on-site measurements and mapping sketches.
A. When assembling pipe fittings, the required pipe fittings should be placed into the pipe threaded buckle and tested for tightness (usually hand paired with 3 buckles). Apply lead oil to the threaded buckle, use hemp, and then place it into the pipe fitting. Use a pipe wrench to tighten the pipe fittings to expose 2-3 buckles from the line. Remove the hemp head, wipe off the lead oil, place the numbers in the appropriate position, and then wait for them to straighten.
B. Choose an appropriate pipe wrench based on the diameter of the pipe fittings to be installed.
4. Pipeline section: Straighten the pipeline with the installed pipe fittings before installation.
A. Apply lead oil to the threaded joint of the pipe section where pipeline fittings are installed, and then connect two or more parts. When connecting, do not only pay attention to the direction of the reserved opening, but also pay attention to the curvature of the pipeline. After aligning with each other, rotate the direction of the reserved opening. Get to the right place and maintain dignity.
B. After connecting the pipeline section, it is necessary to check the diameter of the pipeline, whether the reserved opening direction and diameter reduction position are correct, and whether the planning drawing before straightening is correct according to the plan drawing.
C. The straightening of the pipeline should be placed on the pipeline adjustment frame or platform. Usually, it is suitable for two people to operate. One person visually inspects the end of the pipe section, while the other person hits the bend with a hammer while striking and observing until it is confirmed that there is no distortion in the straightened pipe section, and marks the connection point between the two pipe sections. Delete one or more parts, then connect another part or part until the adjustment is completed.
D. For pipes with excessive bends or large diameters at the connection points of the pipeline section, an oven or gas welding can be used to heat them up to 600-800 ° C (fiery red). Place the pipes on the pipe rack and roll them continuously using their weight to straighten them, or use wooden pads to straighten them by tapping them with a hammer in a heated area. After straightening, roll continuously before cooling. When the temperature reaches the appropriate time, apply engine oil to the heated area. All screws that have been straightened by heating must be marked, removed, repainted with lead oil and wrapped in hemp, then the pipeline must be aligned with the markings and tightened.
E. When straightening the pipeline with the installed valve, the valve cover should be removed first and the valve should be firmly filled before impact to prevent cracking of the valve body.
F. Heating galvanized carbon steel pipes is not allowed.
G. When straightening, do not damage the pipeline section.